Operate
Run the cluster as a service, not as a one-time install.
This section covers the full day 2 lifecycle of an OpenBao cluster: make it reliable, protect data before risky change, use cluster controls deliberately, and move from troubleshooting into recovery when normal operations are no longer enough.
Reliability & Change
- 01Open
Production checklist
Use the checklist before you call an environment production-ready or supportable.
- 02Open
Configure backups
Set up snapshot streaming, backup identity, and restore readiness before you need them.
- 03Open
Plan upgrades
Use RollingUpdate or BlueGreen with a clear understanding of prerequisites, cutover, and retry behavior.
Cluster Controls
- 01Open
Run planned maintenance
Use maintenance workflows for controlled disruption, scaling, and planned cluster interventions.
- 02Open
Pause reconciliation
Temporarily stop operator-driven changes when you need manual intervention or a controlled investigation window.
- 03Open
Decommission a cluster
Remove a cluster deliberately with the right deletion policy for data, PVCs, and external backups.
Troubleshooting & Recovery
Supporting context
You are reading docs for version 0.1.0. Use the version menu to switch to next or another archived release.
Was this page helpful?
Use Needs work to open a structured GitHub issue for this page. The Yes button only acknowledges the signal locally.